Solar Panel Site Survey
OK – the site survey has been carried out. I have requested the system which I had researched and everything seems achievable.
What did my survey consist of On survey day the man carrying out the survey turned-up early. He had a little look at the roof from the outside before preceding to the loft where he took internal measurements, between the eaves and also between the walls. He also took a compass reading and measured the thickness of the rafters. The meter which is located downstairs was also checked. The whole survey took no longer that 30-minutes to complete.
The same chap also carried out three more surveys close-by on the same day. One was for my father who again was pleased with his solar panel site survey.
My father has also requested the SolarEdge system – this system is probably even more beneficial for him as he has the East-West solar array split mentioned previously and the PowerBoxes should work well when the sun goes over from the East to the West array.
The quotations, project and economy reports should be back by next Friday.